The This Old House Hour
Truck in the New House
TV-G
S14 • E19 Apr 7, 2016 60mA perimeter drain is installed; the new foundation is inspected; the first shipment of pre-cut framing lumber arrives; the landscape plan is explained; and framing begins. In the second half: creating a wildlife oasis; making a wood floor patch look seamless; and unclogging a sink.